BP Bruce 2

Bruce2

BP Bruce 2

The BP Bruce 2 development consisted of a drilling platform (D), bridge linked to a process, utilities and quarters platform (PUQ), and pipelines to Frigg and Brae B. The drilling platform topsides consisted of an integrated deck of approximately 6400 tonnes lift weight and a drilling substructure and derrick assembly mounted on the weather deck, weighing 950 tonnes. The integrated deck incorporatesd 32 well slots, BOP and wellhead equipment, manifolds, drilling fluid storage and handling, and returns treatment. The weather deck provided pipe racking and handling facilities. Both jackets were 4-legged with 16 piles each