BG Armada

BG Armada

BG Armada

The Armada development involved one steel platform depleting three fields-Fleming, Drake, and Hawkins-with combined reserves estimated at 1.2 tcf of gas and 70 million bbl of condensate. The development cost of Armada was significantly reduced below budget through Allinace type incentive arrangements with contractors. The topsides shown here were built at the Methil Yard in Scotland.

© FCH WEB CREATIONS 2014